Docket Number M-2009-2092655 Status ReOpened
Applicant SMART METER PROCUREMENT AND INSTALLATION Utility Code
Complainant Utility Name
Respondent Utility Type
Responsible Bureau OCM eFiling Confirmation Number
Date Filed 03/02/2009 Date Posted 03/02/2009
Case Description Smart Meter Technology Procurement and Installation Plans
Action Date Description Date Posted
11/14/2023 Document Served & Send to LAW to Pub in PA Bltn - Other - See Comments - Nature of Service : Eserve|Postal Mail; ORDER ENTERED 11/14/23 Order has been mailed to all POR on all relevant dockets that do not accept e-service. Order has been E-served on all POR that accept. Please send order to bulletin to publish per OP 6 11/14/2023
11/14/2023 Document EServed to POR - Document 'Order - 2092655-LAW - 11-09-23 - Smart Meter Implementation - Lifting Stay Order - Revised - Final' is eServed 11/14/2023
11/14/2023 Document Published on Web - Document 'Order - 2092655-LAW - 11-09-23 - Smart Meter Implementation - Lifting Stay Order - Revised - Final' is made public 11/14/2023
11/4/2020 Document Served - Other - See Comments - ORDER SERVED 11/4/20 11/4/2020
11/4/2020 Document EServed to POR - Document 'STAY NOTICE with List of SMART METER PROCEEDINGS.docx' is eServed - {D46E02E2-86C5-CE8F-9017-759357E00000} 11/4/2020
11/4/2020 Document EServed to POR - Document 'Order - 2092655-LAW - 10-29-20 -Smart Meter Procurement and Installation' is eServed - {3621116B-8AE0-CE74-87FF-759355D00000} 11/4/2020
11/4/2020 Document Published on Web - Document 'STAY NOTICE with List of SMART METER PROCEEDINGS.docx' is made public 11/4/2020
11/4/2020 Document Published on Web - Document 'Order - 2092655-LAW - 10-29-20 -Smart Meter Procurement and Installation' is made public 11/4/2020
10/23/2020 Case ReOpened - ReOpened - OCM 10/23/2020
7/11/2019 Case Closed - No active tasks exist for this Case 7/11/2019
12/22/2016 Document Published on Web - Document '12-22-16 Joint Statement of VC Place and Chairman Brown' is made public 12/22/2016
12/22/2016 Document EServed to POR - Document 'Order – 2525790-LAW – 12-22-16 PM – Duquesne Meter Testing Waiver Reconsideration' is eServed - {B819D9C9-4DAD-46EA-B21E-6A1F5ED927E7} 12/22/2016
12/22/2016 Document Published on Web - Document 'Order – 2525790-LAW – 12-22-16 PM – Duquesne Meter Testing Waiver Reconsideration' is made public 12/22/2016
12/22/2016 Document EServed to POR - Document '12-22-16 Joint Statement of VC Place and Chairman Brown' is eServed - {7C12D3BF-512F-4D19-A6AA-7E66C3939BF6} 12/22/2016
10/27/2016 Document Published on Web - Document '2016-10-27 Implementation Standards Order DUQ.docx' is made public 10/28/2016
10/27/2016 Document EServed to POR - Document '2016-10-27 Implementation Standards Order FE.docx' is eServed - {2226790C-D21C-4230-805F-E4889640E675} 10/28/2016
10/27/2016 Document Served - Other - See Comments - ORDER ENTERED 10/27/16 10/28/2016
10/27/2016 Document Served - Other - See Comments - ORDER ENTERED 10/27/16 10/28/2016
10/27/2016 Document EServed to POR - Document '2016-10-27 Implementation Standards Order PPL.docx' is eServed - {27C8C87B-A363-47F4-B869-E21BA2DE81E5} 10/28/2016
10/27/2016 Document EServed to POR - Document '2016-10-27 Implementation Standards Order DUQ.docx' is eServed - {6557E4CC-A62C-49C1-8C57-F07AC256F82D} 10/28/2016
10/27/2016 Document Served - Other - See Comments - ORDER ENTERED 10/27/16 10/28/2016
10/27/2016 Document Published on Web - Document '2016-10-27 Implementation Standards Order PPL.docx' is made public 10/28/2016
10/27/2016 Document Published on Web - Document '2016-10-27 Implementation Standards Order FE.docx' is made public 10/28/2016
8/24/2016 Document Served - Other - See Comments - Sec Letter Served 8/24/2016 8/24/2016
8/24/2016 Document Published on Web - Document 'Tariff Approval and Compliance filing PECO.docx' is made public 8/24/2016
8/12/2016 Document Attached to Case - Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan - PPL - PPL Electric Utilities Corporation filed Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan. 8/12/2016
8/12/2016 Document Published on Web - Document 'Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan - PPL' is made public 8/12/2016
8/4/2016 Document Published on Web - Document 'Web Portal Implementation Plan - Duquesne Light Co' is made public 8/4/2016
8/4/2016 Document Attached to Case - Web Portal Implementation Plan - Duquesne Light Co - Duquesne Light Co filed Web Portal Implementation Plan. 8/4/2016
8/2/2016 Document Published on Web - Document 'Historical Interval Usage/ Billing Quality Usage Data Access Implem Plan-Met-Ed,Penelec,PennPower,West PennPower ' is made public 8/2/2016
8/2/2016 Document Attached to Case - Historical Interval Usage/ Billing Quality Usage Data Access Implem Plan-Met-Ed,Penelec,PennPower,West PennPower - Metropolitan Edison Company, Pennsylvania Electric Company, Penn Power and West Penn Power filed Historical Interval Usage & Billing Quality Usage Data Access Implementation Plan. 8/2/2016
8/1/2016 Document Published on Web - Document 'Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan - Peco' is made public 8/1/2016
8/1/2016 Document Attached to Case - Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan - Peco - Peco Energy Co filed Historical Interval Usage & Billing Quality Interval Usage Data Access Implementation Plan. 8/1/2016
7/21/2016 Document Published on Web - Document 'Order - 2525790 - 7-21-16 PM - Petition of Duquesne Light for Waiver and Suspension of Meter Testing Req - Smart Meter Procurement Plan' is made public 7/21/2016
7/21/2016 Document EServed to POR - Document 'Order - 2525790 - 7-21-16 PM - Petition of Duquesne Light for Waiver and Suspension of Meter Testing Req - Smart Meter Procurement Plan' is eServed - {58D8BED6-D231-4795-B09D-0769BA55410D} 7/21/2016
7/1/2016 Document Published on Web - Document 'M-2009-2092655 Technical Implementation Standards Order.docx' is made public 7/1/2016
7/1/2016 Document Removed from Web - Document 'M-2009-2092655 Technical Implementation Standards Order.docx' has been removed from Web 7/1/2016
6/30/2016 Document Served - Other - See Comments - Order Served 6/30/2016 6/30/2016
6/30/2016 Document Published on Web - Document 'M-2009-2092655 Technical Implementation Standards Order.docx' is made public 6/30/2016
6/30/2016 Document EServed to POR - Document 'M-2009-2092655 Technical Implementation Standards Order.docx' is eServed - {1B7957C4-4B25-4B1B-BE54-3B09BBE9582B} 6/30/2016
5/9/2016 Document Attached to Case - Comments - NRG Retail Affiliates - NRG Retail Affiliates filed Comments. 5/9/2016
5/9/2016 Document Published on Web - Document 'Comments - NRG Retail Affiliates ' is made public 5/9/2016
5/3/2016 Document Published on Web - Document 'Answer to Petition - AEMA' is made public 5/3/2016
5/3/2016 Document Attached to Case - Comments - The Mission:data Coalition - The Mission:data Coalition filed Comments. 5/3/2016
5/3/2016 Document Attached to Case - Answer to Petition - AEMA - Advanced Energy Management Alliance (AEMA) filed answer to Petition. 5/3/2016
5/3/2016 Document Published on Web - Document 'Comments - The Mission:data Coalition' is made public 5/3/2016
5/2/2016 Document Published on Web - Document 'Comments-EDEWG' is made public 5/2/2016
5/2/2016 Document Attached to Case - Comments-EDEWG - EDEWG filed Comments 5/2/2016
4/12/2016 Document Published on Web - Document 'Technical Implementation Standards - The Electronic Exchange Working Group' is made public 4/12/2016
4/12/2016 Document Attached to Case - Technical Implementation Standards - The Electronic Exchange Working Group - The Electronic Data Exchange Working Group filed recommendations in response to Tentative Order. 4/12/2016
3/4/2016 Document Served - Other - See Comments - Sec Letter Served 3/4/2016 3/4/2016
3/4/2016 Document Published on Web - Document 'Web Portal Working Group Extension.docx' is made public 3/4/2016
2/24/2016 Document Attached to Case - Petition for Extension of Time to develop web portal standards to April 8 2016 - EDEWG - PA Electronic Data Exchange Working Group filed Petition for Extension of Time to develop a proposed uniform standard for the System-to-System functionality of the web portals. 2/24/2016
2/24/2016 Document Published on Web - Document 'Petition for Extension of Time to develop web portal standards to April 8 2016 - EDEWG' is made public 2/24/2016
11/6/2015 Document Published on Web - Document '2092655 WPWG Final Order NRG Petition for Clar & Recons - Order.docx' is made public 11/6/2015
11/5/2015 Document Published on Web - Document '2092655 WPWG Final Order NRG Petition for Clar & Recons - Order.docx' is made public 11/5/2015
11/5/2015 Document Served - Other - See Comments - ORDER ENTERED 11/5/15 11/5/2015
11/5/2015 Document Removed from Web - Document '2092655 WPWG Final Order NRG Petition for Clar & Recons - Order.docx' has been removed from Web 11/5/2015
11/5/2015 Document EServed to POR - Document '2092655 WPWG Final Order NRG Petition for Clar & Recons - Order.docx' is eServed - {EEAC3342-437A-4A52-BD97-88537E154A77} 11/5/2015
10/2/2015 Document Attached to Case - Answer to Petition for Clarification-Duquesne Light Co - Duquesne Light Co filed Answer to Petition for Clarification 10/2/2015
10/2/2015 Document Attached to Case - Answer to Petition for Clarification-Met Ed et al - Met Ed, Penelec, Penn Power Co, and West Penn Power Co filed Answer to Petition for Clarification 10/2/2015
10/2/2015 Document Published on Web - Document 'Answer to Petition for Clarification-Met Ed et al' is made public 10/2/2015
10/2/2015 Document Published on Web - Document 'Answer to Petition for Clarification-Duquesne Light Co' is made public 10/2/2015
10/1/2015 Document EServed to POR - Document 'Opinion and Order - 2092655-OSA - 10-1-15 PM - Short Form Reconsideration' is eServed - {D77E5DCD-9134-4076-9552-7CBC06DC6E70} 10/1/2015
10/1/2015 Document Served - Other - See Comments - Order Served 10/1/2015 10/1/2015
10/1/2015 Document Published on Web - Document 'Opinion and Order - 2092655-OSA - 10-1-15 PM - Short Form Reconsideration' is made public 10/1/2015
9/28/2015 Document Attached to Case - Ltr in Support of NRG Retail Affiliates Petition - Dir Energy - Direct Energy filed letter in support of NRG Retail Affiliates Petition regarding the Commission's Final Order of 9/3/15. 9/28/2015
9/28/2015 Document Attached to Case - Answer to NRG Ret Affiliates Pet Reconsider-WGL Energy - WGL Energy Services Inc filed answer in support of NRG Retail Affiliates Petition for Clarification/Reconsideration of Commission's Final Order of 9/3/15. 9/28/2015
9/28/2015 Document Published on Web - Document 'Answer to NRG Ret Affiliates Pet Reconsider-WGL Energy' is made public 9/28/2015
9/28/2015 Document Published on Web - Document 'Answer to Petition-PPL Electric Utilities Corp' is made public 9/28/2015
9/28/2015 Document Published on Web - Document 'Ltr in Support of NRG Retail Affiliates Petition - Dir Energy' is made public 9/28/2015
9/28/2015 Document Attached to Case - Answer to Petition-Retail Energy Supply Association - Retail Energy Supply Association filed Answer to Petition 9/28/2015
9/28/2015 Document Attached to Case - Answer to Pet Reconsider/Clarification of NRG Ret Affiliates-PECO - PECO filed answer to Petition of NRG Retail Affiliates Petition for Reconsideration/Clarification regarding Commission's Final Order of 9/3/15. 9/28/2015
9/28/2015 Document Published on Web - Document 'Answer to Petition-Retail Energy Supply Association' is made public 9/28/2015
9/28/2015 Document Attached to Case - Answer to Petition-PPL Electric Utilities Corp - PPL Electric Utilities Corp filed Answer to Petition 9/28/2015
9/28/2015 Document Published on Web - Document 'Answer to Pet Reconsider/Clarification of NRG Ret Affiliates-PECO' is made public 9/28/2015
9/21/2015 Document Published on Web - Document 'Pet for Clarification/Reconsideration of 9/3/2015 Final Order- NRG Retail Affiliates' is made public 9/21/2015
9/21/2015 Document Attached to Case - Pet for Clarification/Reconsideration of 9/3/2015 Final Order- NRG Retail Affiliates - NRG Retail Affiliates - NRG Home, Green Mountain Energy Company and Energy Plus Holdings LLC filed Petition for Clarification and/or Reconsideration of the Commission's Final Order entered September 3, 2015. 9/21/2015
9/3/2015 Document Served - Other - See Comments - ORDER ENTERED 9/3/15 9/3/2015
9/3/2015 Document Published on Web - Document 'Commissioner Witmer Statement 2092655 OCM.pdf' is made public 9/3/2015
9/3/2015 Document EServed to POR - Document 'M-2009-2092655 Web Portal Final Order.docx' is eServed - {8A412458-E6C7-4BE6-88C8-B2F085F54332} 9/3/2015
9/3/2015 Document Published on Web - Document 'M-2009-2092655 Web Portal Final Order.docx' is made public 9/3/2015
6/2/2015 Document Published on Web - Document 'Comments - EDEWG' is made public 6/2/2015
6/2/2015 Document Attached to Case - Comments - EDEWG - The Electronic Data Exchange Working Group (EDEWG) filed comments. 6/2/2015
5/28/2015 Document Published on Web - Document 'Reply Comments - EDEWG' is made public 5/28/2015
5/28/2015 Document Attached to Case - Comments - PPL Electric - PPL Electric Utilities Corp filed comments. 5/28/2015
5/28/2015 Document Attached to Case - Reply Comments - EDEWG - The Electronic Data Exchange Working Group filed reply comments. 5/28/2015
5/28/2015 Document Published on Web - Document 'Comments - Duquesne Light' is made public 5/28/2015
5/28/2015 Document Attached to Case - Comments - Duquesne Light - Duquesne Light Co filed comments. 5/28/2015
5/28/2015 Document Published on Web - Document 'Comments - PPL Electric' is made public 5/28/2015
5/27/2015 Document Published on Web - Document 'Comments - RESA' is made public 5/27/2015
5/27/2015 Document Published on Web - Document 'Comments - PECO' is made public 5/27/2015
5/27/2015 Document Attached to Case - Comments - Industrial Customer Groups - Industrial Energy Consumers of Pennsylvania (IECPA), Met-Ed Industrial Users Group (MEIUG), Penelec Industrial Customer Alliance (PICA), Penn Power Users Group (PPUG), Philadelphia Area Industrial Energy Users Group (PAIEUG), PP&L Industrial Customer Alliance (PPLICA), and West Penn Power Industrial Intervenors (WPPII) (Industrial Customer Groups) filed comments. 5/27/2015
5/27/2015 Document Attached to Case - Comments - RESA - Retail Energy Supply Association (RESA) filed comments. 5/27/2015
5/27/2015 Document Published on Web - Document 'Comments - Met-Ed, Penelec, PennPower,West Penn' is made public 5/27/2015
5/27/2015 Document Published on Web - Document 'Comments - Industrial Customer Groups' is made public 5/27/2015
5/27/2015 Document Attached to Case - Comments - Met-Ed, Penelec, PennPower,West Penn - Metropolitan Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company and West Penn Power Company filed comments. 5/27/2015
5/27/2015 Document Attached to Case - Comments - PECO - PECO filed comments. 5/27/2015
5/27/2015 Document Published on Web - Document 'Comments - The Mission:data Coalition & EDF' is made public 5/27/2015
5/27/2015 Document Attached to Case - Comments - The Mission:data Coalition & EDF - The Mission:data Coalition and Environmental Defense Fund (EDF) filed comments. 5/27/2015
5/26/2015 Document Published on Web - Document 'Comments - Energy Assn of PA' is made public 5/26/2015
5/26/2015 Document Attached to Case - Comments - NRG Retail Affiliates - NRG Retail Affiliates filed comments. 5/26/2015
5/26/2015 Document Published on Web - Document 'Comments - NRG Retail Affiliates' is made public 5/26/2015
5/26/2015 Document Attached to Case - Comments - Energy Assn of PA - Energy Association of Pennsylvania filed comments. 5/26/2015
5/19/2015 Document Published on Web - Document 'Comments - WGL Energy Services Inc' is made public 5/19/2015
5/19/2015 Document Attached to Case - Comments - WGL Energy Services Inc - WGL Energy Services Inc filed Comments. 5/19/2015
4/24/2015 Document Served & Pend - Pend for Comments 4/24/2015
4/23/2015 Document EServed to POR - Document 'M-2009-2092655 Web Portal Tentative Order.docx' is eServed - {C60B7130-39E2-433B-9162-45636734AF76} 4/23/2015
4/23/2015 Document EServed to POR - Document '4.23.15 Statement of Commissioner Cawley' is eServed - {A619D3A8-42FA-4F3E-8251-11D56A2AE53B} 4/23/2015
4/23/2015 Document Published on Web - Document '4.23.15 Statement of Commissioner Cawley' is made public 4/23/2015
4/23/2015 Document Served & Send to C&A - Other - See Comments - ORDER ENTERED 4/23/15...WRITTEN COMMENTS DUE 5/26/15 4/23/2015
4/23/2015 Document Published on Web - Document 'M-2009-2092655 Web Portal Tentative Order.docx' is made public 4/23/2015
3/25/2015 Document Published on Web - Document 'Comments - EDEWG' is made public 3/25/2015
3/25/2015 Document Attached to Case - Comments - EDEWG - Electronic Data Exchange Working Group filed comments. 3/25/2015
3/25/2015 Document Published on Web - Document 'Comments - EDEWG' is made public 3/25/2015
3/25/2015 Document Attached to Case - Comments - EDEWG - Electronic Data Exchange Working Group filed comments. 3/25/2015
3/24/2015 Document Published on Web - Document 'Comments - WGL Energy Services Inc' is made public 3/24/2015
3/24/2015 Document Attached to Case - Comments - WGL Energy Services Inc - WGL Energy Services Inc filed Comments. 3/24/2015
3/13/2015 Document Attached to Case - Letter in Regards to EDEWG Report - NRG Retail - NRG Retail filed letter in regards to EDEWG report. 3/13/2015
3/13/2015 Document Published on Web - Document 'Letter in Regards to EDEWG Report - NRG Retail' is made public 3/13/2015
2/26/2015 Document Published on Web - Document 'Proposed Web Portal Working Group - EDEWG' is made public 2/26/2015
2/26/2015 Document Attached to Case - Proposed Web Portal Working Group - EDEWG - Electronic Data Exchange Working Group filed proposals of its Web Portal Working Group 2/26/2015
4/17/2014 Document Served - Other - See Comments - SEC LETTER SERVED 4/17/14 4/17/2014
4/17/2014 Document Published on Web - Document 'sec ltr 2092655.docx' is made public 4/17/2014
3/20/2014 Document Published on Web - Document 'Status Letter - EDEWG' is made public 3/20/2014
2/19/2014 Document Attached to Case - Letter Request to Modify - EDEWG Leadership - EDEWG Leadership filed letter requesting approval to modify scope of the proposed solution as well as the scope of the deliverable required by March 1, 2014. 2/19/2014
2/19/2014 Document Published on Web - Document 'Letter Request to Modify - EDEWG Leadership' is made public 2/19/2014
1/25/2013 Document Removed from Web - Document '20121009 SMI Final Order' has been removed from Web 1/25/2013
1/25/2013 Document Published on Web - Document '20121009 SMI Final Order' is made public 1/25/2013
12/6/2012 Document EServed to POR - Document '20121009 SMI Final Order' is eServed - {234AF263-BB77-4F0D-9589-1284ADA14286} 12/6/2012
12/6/2012 Document Published on Web - Document '20121009 SMI Final Order' is made public 12/6/2012
12/6/2012 Document Served - Other - See Comments - Order served 12/6/12 12/6/2012
10/6/2011 Document Attached to Case - Comments - DRSG - Demand Response & Smart Grid Coalition (DRSG) filed comments to 7/8/11 Tentative Order. 10/6/2011
10/6/2011 Document Published on Web - Document 'Comments - DRSG' is made public 10/6/2011
9/13/2011 Document Published on Web - Document 'REPLY COMMENTS - PECO ENERGY CO' is made public 9/13/2011
9/13/2011 Document Attached to Case - REPLY COMMENTS - PECO ENERGY CO - Peco Energy Co filed reply comments. 9/13/2011
9/12/2011 Document Attached to Case - Reply Comments - FirstEnergy Solutions - FirstEnergy Solutions Corporation filed reply comments. 9/12/2011
9/12/2011 Document Published on Web - Document 'Reply Comments - FirstEnergy Solutions' is made public 9/12/2011
8/24/2011 Document Published on Web - Document 'COMMENTS - PPL ELECTRIC' is made public 8/24/2011
8/24/2011 Document Attached to Case - COMMENTS - ENERGY ASSOC OF PA - Energy Association of Pennsylvania filed comments. 8/24/2011
8/24/2011 Document Published on Web - Document 'COMMENTS - MET ED, PENELEC, PENN POWER, WEST PENN POWER' is made public 8/24/2011
8/24/2011 Document Attached to Case - COMMENTS - PPL ELECTRIC - PPL Electric Utilities Corp filed comments. 8/24/2011
8/24/2011 Document Published on Web - Document 'COMMENTS - ENERGY ASSOC OF PA' is made public 8/24/2011
8/24/2011 Document Attached to Case - COMMENTS - MET ED, PENELEC, PENN POWER, WEST PENN POWER - Met Ed, Penelec, Penn Power and West Penn Power Co filed comments. 8/24/2011
8/22/2011 Document Published on Web - Document 'COMMENTS - DUQUESNE LIGHT CO' is made public 8/22/2011
8/22/2011 Document Published on Web - Document 'COMMENTS - PECO ENERGY CO' is made public 8/22/2011
8/22/2011 Document Attached to Case - COMMENTS - ELECTRONIC DATA EXCHANGE WORKING GROUP - Electronic Data Exchange Working Group filed comments. 8/22/2011
8/22/2011 Document Attached to Case - COMMENTS - DUQUESNE LIGHT CO - Duquesne Light Co filed comments. 8/22/2011
8/22/2011 Document Published on Web - Document 'COMMENTS - ELECTRONIC DATA EXCHANGE WORKING GROUP' is made public 8/22/2011
8/22/2011 Document Attached to Case - COMMENTS - PECO ENERGY CO - Peco Energy Co filed comments. 8/22/2011
8/11/2011 Document Attached to Case - Opposition to Smart Meter Plan - Tucker - Dr. & Mrs. Tucker filed letter opposing Peco's Smart Meter plan. 8/11/2011
8/11/2011 Document Published on Web - Document 'Opposition to Smart Meter Plan - Tucker' is made public 8/11/2011
8/2/2011 Document Published on Web - Document 'Annual Progress Report - Met-Ed, Penelec, Penn Power' is made public 8/2/2011
8/2/2011 Document Attached to Case - Annual Progress Report - Met-Ed, Penelec, Penn Power - Met-ed, Penelec & Penn Power jointly filed their report on the annual progress made on their Smart Meter Technology Procurement & Installation Plan. 8/2/2011
7/8/2011 Document Served & Send to C&A - Other - See Comments - 30 DAYS FOR COMMENTS 50 DAYS FOR REPLIES FROM DATE OF PUBLICATION IN PA BULLETIN (7/30/11) 7/8/2011
7/8/2011 Document Served & Pend - Pend for Comments 7/8/2011
7/8/2011 Document Published on Web - Document 'SM Implementation Order on Data Interchange 06202011.docx' is made public 7/8/2011
6/30/2011 Assigned Responsible Bureau - FUS - 6/30/2011
12/8/2009 Document Published on Web - Document 'Pet for Extension of Time & Preliminary Proposal - EDEWG' is made public 12/8/2009
12/8/2009 Document Attached to Case - Pet for Extension of Time & Preliminary Proposal - EDEWG - PA Electronic Data Exchange Working Group filed reqest for Extension of Time to allow formation of an Expanded Sub-Team and Preliminary Proposal for the Development of Smart Meter Data Exchange Standards. 12/8/2009
7/13/2009 Published in PA Bulletin - Other - See Comments - 39 Pa.B. 3574 7/13/2009
7/1/2009 Document Published on Web - Document 'Smart Meter Meeting Announcement for July 16, 2009' is made public 7/1/2009
6/24/2009 Document Published on Web - Document 'Smart Meter implementation Order incorporating Motion 6-23-09' is made public 6/24/2009
6/24/2009 Document Served & Send to LAW to Pub in PA Bltn - Other - See Comments - Order to be published in PA Bulletin 6/24/2009
6/19/2009 Document Published on Web - Document 'Statement of RFP Smart Meter Implementation Act of 129 2092655-LAW.doc' is made public 6/19/2009
6/18/2009 Document Published on Web - Document 'TC Motion - 2092655-LAW - Smart Meter.doc' is made public 6/18/2009
5/7/2009 Document Published on Web - Document 'Comments-Exelon Energy' is made public 5/7/2009
5/7/2009 Document Attached to Case - Comments-Exelon Energy - Exelon Energy filed comments 5/7/2009
5/6/2009 Document Published on Web - Document 'Reply Comments-PPL Electric Utilities' is made public 5/6/2009
5/6/2009 Document Attached to Case - Reply Comments-PPL Electric Utilities - PPL Electric Utilities Corporation filed Reply Comments. 5/6/2009
5/6/2009 Document Published on Web - Document 'SL denying walmart comment period extension [2].doc' is made public 5/6/2009
5/6/2009 Document Served - Other - See Comments - SL served 5/6/09. 5/6/2009
5/4/2009 Document Published on Web - Document 'Reply Comments - Wal-Mart' is made public 5/4/2009
5/4/2009 Document Attached to Case - Reply Comments - Wal-Mart - Wal-Mart filed Reply Comments 5/4/2009
5/1/2009 Document Published on Web - Document 'Reply Comments-PECO' is made public 5/1/2009
5/1/2009 Document Attached to Case - Reply Comments-PECO - PECO Energy Company filed Reply Comments 5/1/2009
4/30/2009 Document Published on Web - Document 'Reply Comments-Industrial Customer Groups' is made public 4/30/2009
4/30/2009 Document Published on Web - Document 'Reply Comments-Metropolitan Edison,Pennsylvania Electric and Pennsylvania Power' is made public 4/30/2009
4/30/2009 Document Published on Web - Document 'Reply Comments-Energy Association of Pennsylvania' is made public 4/30/2009
4/30/2009 Document Published on Web - Document 'Reply Comments-Duquesne Light Company' is made public 4/30/2009
4/30/2009 Document Attached to Case - Reply Comments-Industrial Customer Groups - Industrial Customer Groups filed Reply Comments. 4/30/2009
4/30/2009 Document Attached to Case - Reply Comments-Duquesne Light Company - Duquesne Light Company filed Reply Comments. 4/30/2009
4/30/2009 Document Attached to Case - Reply Comments-Metropolitan Edison,Pennsylvania Electric and Pennsylvania Power - Metropolitan Edison Co, Pennsylvania Electric Co, and Pennsylvania Power Co filed Reply Comments. 4/30/2009
4/30/2009 Document Attached to Case - Reply Comments-Energy Association of Pennsylvania - Energy Association of Pennsylvania filed Reply Comments. 4/30/2009
4/30/2009 Document Published on Web - Document 'Wal-Mart/Sam's Petition for Extension of Time' is made public 4/30/2009
4/30/2009 Document Attached to Case - Wal-Mart/Sam's Petition for Extension of Time - Wal-Mart Stores East, LP & Sam's East Inc filed Petition for Extension of time. 4/30/2009
4/24/2009 Document Published on Web - Document 'Comments by Trilliant' is made public 4/24/2009
4/24/2009 Document Attached to Case - Comments by Trilliant - Trilliant filed comments. 4/24/2009
4/23/2009 Document Published on Web - Document 'Comments Refiled-WEST PENN POWER.pdf' is made public 4/23/2009
4/23/2009 Document Attached to Case - Comments Refiled-WEST PENN POWER.pdf - West Penn Power Company d/b/a Allegheny Power re-filed Comments dated 4/20/2009. 4/23/2009
4/23/2009 Document Published on Web - Document 'Comments-Constellation NewEnergy, Inc.' is made public 4/23/2009
4/23/2009 Document Attached to Case - Comments-Constellation NewEnergy, Inc. - Constellation NewEnergy, Inc. filed Initial Comments. 4/23/2009
4/23/2009 Document Published on Web - Document 'Comments-Metropolitan Edison,Pennsylvania Electric,Pennsylvania Power' is made public 4/23/2009
4/23/2009 Document Attached to Case - Comments-Metropolitan Edison,Pennsylvania Electric,Pennsylvania Power - Comments filed by Metropolitan Edison, Pennsylvania Electric and Pennsylvania Power Companies. 4/23/2009
4/22/2009 Document Published on Web - Document 'Comments-PPL Electric Utilities Corporation' is made public 4/22/2009
4/22/2009 Document Attached to Case - Comments-PPL Electric Utilities Corporation - PPL Electric Utilities Corporation filed Comments. 4/22/2009
4/22/2009 Document Attached to Case - Comments-Energy Assn of PA - Energy Assn. of PA filed Comments. 4/22/2009
4/22/2009 Document Published on Web - Document 'Comments-Industrial Customer Groups' is made public 4/22/2009
4/22/2009 Document Published on Web - Document 'Comments-Duquesne Light Company' is made public 4/22/2009
4/22/2009 Document Attached to Case - Comments-Duquesne Light Company - Comments filed by Duquesne Light Co. 4/22/2009
4/22/2009 Document Attached to Case - Comments-Industrial Customer Groups - Comments filed by Industrial Customer Groups to the Draft Staff Proposal & Additional Questions issued on the proceeding on March 30, 2009. 4/22/2009
4/21/2009 Document Published on Web - Document 'Comments by Citizen Power' is made public 4/21/2009
4/21/2009 Document Attached to Case - Comments by Citizen Power - Comments filed by Citizen Power. 4/21/2009
4/21/2009 Document Published on Web - Document 'COMMENTS-ELSTER INTERGRATED SOLUTIONS' is made public 4/21/2009
4/21/2009 Document Published on Web - Document 'Comments by Tendril Networks Inc' is made public 4/21/2009
4/21/2009 Document Published on Web - Document 'COMMENTS-SENSUS METERING SYSTEMS' is made public 4/21/2009
4/21/2009 Document Attached to Case - COMMENTS-SENSUS METERING SYSTEMS - Sensus Metering Systems filed comments. 4/21/2009
4/21/2009 Document Attached to Case - Comments by Tendril Networks Inc - Tendril Networks Inc filed Comments. 4/21/2009
4/21/2009 Document Attached to Case - COMMENTS-ELSTER INTERGRATED SOLUTIONS - ELSTER INTEGRATED SOLUTIONS filed comments. 4/21/2009
4/21/2009 Document Published on Web - Document 'Comments by Peco Energy' is made public 4/21/2009
4/21/2009 Document Attached to Case - Comments by Peco Energy - Peco Energy filed Comments. 4/21/2009
4/20/2009 Document Published on Web - Document 'Comments - West Penn dba Allegheny Power' is made public 4/20/2009
4/20/2009 Document Attached to Case - Comments - West Penn dba Allegheny Power - West Penn Power Company dba Allegheny Power filed Comments 4/20/2009
4/20/2009 Document Published on Web - Document 'Comments - OCA' is made public 4/20/2009
4/20/2009 Document Attached to Case - Comments - OCA - OCA filed Comments 4/20/2009
4/9/2009 Document Published on Web - Document 'Smart Meter SL extending comment period.doc' is made public 4/9/2009
4/9/2009 Document Served - Other - See Comments - SL served 4/9/09. 4/9/2009
3/30/2009 Document Published on Web - Document 'Smart Meter Staff Proposal and questions for comment 3-27-09.doc' is made public 3/30/2009
3/30/2009 Document Served - Other - See Comments - SEC LTR SERVED 3/30/09 3/30/2009
3/24/2009 Document Published on Web - Document 'PETITION TO INTERVENE-TRILLIANT INC' is made public 3/24/2009
3/24/2009 Document Published on Web - Document 'PETITION TO INTERVENE-SENSUS METERING SYSTEMS' is made public 3/24/2009
3/24/2009 Document Attached to Case - PETITION TO INTERVENE-TRILLIANT INC - PETITION TO INTERVENE ON BEHALF OF TRILLIANT, INC. 3/24/2009
3/24/2009 Document Attached to Case - PETITION TO INTERVENE-SENSUS METERING SYSTEMS 3/24/2009
3/16/2009 Document Published on Web - Document 'ELSTER INTEGRATED Pet Intervene.pdf' is made public 3/16/2009
3/16/2009 Document Attached to Case - ELSTER INTEGRATED Pet Intervene.pdf - ELSTER INTEGRATED SOLUTIONS FILED PETITION TO INTERVENE 3/16/2009
3/2/2009 Case Created - M-2009-2092655 - Created Case-2092655 3/2/2009
3/2/2009 Case Assigned to Bureau - LAW - Created Case-2092655 3/2/2009
Document Name Document Type eFiling Confirmation Number Date Received Post On Date Date Served Reference Docket Number
ORDER - 2092655-LAW - 11-09-23 - SMART METER IMPLEMENTATION - LIFTING STAY ORDER - REVISED - FINAL Order 11/14/2023 11/14/2023 M-2009-2092655
STAY NOTICE WITH LIST OF SMART METER PROCEEDINGS.DOCX Secretarial Letter 11/4/2020 11/4/2020 M-2009-2092655
ORDER - 2092655-LAW - 10-29-20 -SMART METER PROCUREMENT AND INSTALLATION Order 11/4/2020 11/4/2020 M-2009-2092655
ORDER – 2525790-LAW – 12-22-16 PM – DUQUESNE METER TESTING WAIVER RECONSIDERATION Order 12/22/2016 12/22/2016 M-2009-2092655
12-22-16 JOINT STATEMENT OF VC PLACE AND CHAIRMAN BROWN Statement 12/22/2016 M-2009-2092655
2016-10-27 IMPLEMENTATION STANDARDS ORDER DUQ.DOCX Order 10/27/2016 10/27/2016 M-2009-2092655
2016-10-27 IMPLEMENTATION STANDARDS ORDER FE.DOCX Order 10/27/2016 10/27/2016 M-2009-2092655
2016-10-27 IMPLEMENTATION STANDARDS ORDER PPL.DOCX Order 10/27/2016 10/27/2016 M-2009-2092655
TARIFF APPROVAL AND COMPLIANCE FILING PECO.DOCX Secretarial Letter 8/24/2016 8/24/2016 M-2009-2092655
HISTORICAL INTERVAL USAGE & BILLING QUALITY INTERVAL USAGE DATA ACCESS IMPLEMENTATION PLAN - PPL Letter 8/10/2016 8/12/2016 M-2009-2092655
WEB PORTAL IMPLEMENTATION PLAN - DUQUESNE LIGHT CO Case Related Document 7/29/2016 8/4/2016 M-2009-2092655
HISTORICAL INTERVAL USAGE/ BILLING QUALITY USAGE DATA ACCESS IMPLEM PLAN-MET-ED,PENELEC,PENNPOWER,WEST PENNPOWER Letter 8/1/2016 8/2/2016 M-2009-2092655
HISTORICAL INTERVAL USAGE & BILLING QUALITY INTERVAL USAGE DATA ACCESS IMPLEMENTATION PLAN - PECO Letter 7/29/2016 8/1/2016 M-2009-2092655
ORDER - 2525790 - 7-21-16 PM - PETITION OF DUQUESNE LIGHT FOR WAIVER AND SUSPENSION OF METER TESTING REQ - SMART METER PROCUREMENT PLAN Order 7/21/2016 7/21/2016 M-2009-2092655
M-2009-2092655 TECHNICAL IMPLEMENTATION STANDARDS ORDER.DOCX Order 7/1/2016 6/30/2016 M-2009-2092655
COMMENTS - NRG RETAIL AFFILIATES Comments 5/9/2016 5/9/2016 M-2009-2092655
COMMENTS - THE MISSION:DATA COALITION Comments 5/3/2016 5/3/2016 M-2009-2092655
ANSWER TO PETITION - AEMA Answer to Petition 5/3/2016 5/3/2016 M-2009-2092655
COMMENTS-EDEWG Comments 5/2/2016 5/2/2016 M-2009-2092655
TECHNICAL IMPLEMENTATION STANDARDS - THE ELECTRONIC EXCHANGE WORKING GROUP Case Related Document 4/12/2016 4/12/2016 M-2009-2092655
WEB PORTAL WORKING GROUP EXTENSION.DOCX Secretarial Letter 3/4/2016 3/4/2016 M-2009-2092655
PETITION FOR EXTENSION OF TIME TO DEVELOP WEB PORTAL STANDARDS TO APRIL 8 2016 - EDEWG Petition for Extension of Time 2/20/2016 2/24/2016 M-2009-2092655
2092655 WPWG FINAL ORDER NRG PETITION FOR CLAR & RECONS - ORDER.DOCX Order 11/6/2015 11/5/2015 M-2009-2092655
ANSWER TO PETITION FOR CLARIFICATION-DUQUESNE LIGHT CO Answer to Petition 9/28/2015 10/2/2015 M-2009-2092655
ANSWER TO PETITION FOR CLARIFICATION-MET ED ET AL Answer to Petition 9/28/2015 10/2/2015 M-2009-2092655
OPINION AND ORDER - 2092655-OSA - 10-1-15 PM - SHORT FORM RECONSIDERATION Order 10/1/2015 10/1/2015 M-2009-2092655
ANSWER TO PETITION-PPL ELECTRIC UTILITIES CORP Answer to Petition 9/28/2015 9/28/2015 M-2009-2092655
ANSWER TO NRG RET AFFILIATES PET RECONSIDER-WGL ENERGY Answer to Petition 9/28/2015 9/28/2015 M-2009-2092655
ANSWER TO PET RECONSIDER/CLARIFICATION OF NRG RET AFFILIATES-PECO Answer to Petition 9/28/2015 9/28/2015 M-2009-2092655
ANSWER TO PETITION-RETAIL ENERGY SUPPLY ASSOCIATION Answer to Petition 9/28/2015 9/28/2015 M-2009-2092655
LTR IN SUPPORT OF NRG RETAIL AFFILIATES PETITION - DIR ENERGY Letter 9/28/2015 9/28/2015 M-2009-2092655
PET FOR CLARIFICATION/RECONSIDERATION OF 9/3/2015 FINAL ORDER- NRG RETAIL AFFILIATES Petition for Reconsideration 9/18/2015 9/21/2015 M-2009-2092655
M-2009-2092655 WEB PORTAL FINAL ORDER.DOCX Order 9/3/2015 9/3/2015 M-2009-2092655
COMMISSIONER WITMER STATEMENT 2092655 OCM.PDF Statement 9/3/2015 9/3/2015 M-2009-2092655
COMMENTS - EDEWG Comments 5/28/2015 6/2/2015 M-2009-2092655
COMMENTS - PPL ELECTRIC Comments 5/26/2015 5/28/2015 M-2009-2092655
COMMENTS - DUQUESNE LIGHT Comments 5/26/2015 5/28/2015 M-2009-2092655
REPLY COMMENTS - EDEWG Reply Comments 5/22/2015 5/28/2015 M-2009-2092655
COMMENTS - RESA Comments 5/26/2015 5/27/2015 M-2009-2092655
COMMENTS - PECO Comments 5/26/2015 5/27/2015 M-2009-2092655
COMMENTS - MET-ED, PENELEC, PENNPOWER,WEST PENN Comments 5/26/2015 5/27/2015 M-2009-2092655
COMMENTS - INDUSTRIAL CUSTOMER GROUPS Comments 5/26/2015 5/27/2015 M-2009-2092655
COMMENTS - THE MISSION:DATA COALITION & EDF Comments 5/26/2015 5/27/2015 M-2009-2092655
COMMENTS - ENERGY ASSN OF PA Comments 5/26/2015 5/26/2015 M-2009-2092655
COMMENTS - NRG RETAIL AFFILIATES Comments 5/26/2015 5/26/2015 M-2009-2092655
COMMENTS - WGL ENERGY SERVICES INC Comments 5/19/2015 5/19/2015 M-2009-2092655
M-2009-2092655 WEB PORTAL TENTATIVE ORDER.DOCX Tentative Order 4/23/2015 4/23/2015 M-2009-2092655
4.23.15 STATEMENT OF COMMISSIONER CAWLEY Statement 4/23/2015 M-2009-2092655
COMMENTS - EDEWG Letter 3/25/2015 3/25/2015 M-2009-2092655
COMMENTS - EDEWG Letter 3/25/2015 3/25/2015 M-2009-2092655
COMMENTS - WGL ENERGY SERVICES INC Comments 3/24/2015 3/24/2015 M-2009-2092655
LETTER IN REGARDS TO EDEWG REPORT - NRG RETAIL Letter 3/13/2015 3/13/2015 M-2009-2092655
PROPOSED WEB PORTAL WORKING GROUP - EDEWG Case Related Document 2/23/2015 2/26/2015 M-2009-2092655
SEC LTR 2092655.DOCX Secretarial Letter 4/17/2014 4/17/2014 M-2009-2092655
STATUS LETTER - EDEWG Case Related Document 3/20/2014 M-2009-2092655
LETTER REQUEST TO MODIFY - EDEWG LEADERSHIP Case Related Document 2/11/2014 2/19/2014 M-2009-2092655
20121009 SMI FINAL ORDER Order 1/25/2013 12/6/2012 M-2009-2092655
COMMENTS - DRSG Comments 9/29/2011 10/6/2011 M-2009-2092655
REPLY COMMENTS - PECO ENERGY CO Reply Comments 9/12/2011 9/13/2011 M-2009-2092655
REPLY COMMENTS - FIRSTENERGY SOLUTIONS Reply Comments 9/12/2011 9/12/2011 M-2009-2092655
COMMENTS - MET ED, PENELEC, PENN POWER, WEST PENN POWER Comments 8/22/2011 8/24/2011 M-2009-2092655
COMMENTS - PPL ELECTRIC Comments 8/22/2011 8/24/2011 M-2009-2092655
COMMENTS - ENERGY ASSOC OF PA Comments 8/22/2011 8/24/2011 M-2009-2092655
COMMENTS - ELECTRONIC DATA EXCHANGE WORKING GROUP Comments 8/22/2011 8/22/2011 M-2009-2092655
COMMENTS - PECO ENERGY CO Comments 8/22/2011 8/22/2011 M-2009-2092655
COMMENTS - DUQUESNE LIGHT CO Comments 8/22/2011 8/22/2011 M-2009-2092655
OPPOSITION TO SMART METER PLAN - TUCKER Case Related Document 8/9/2011 8/11/2011 M-2009-2092655
ANNUAL PROGRESS REPORT - MET-ED, PENELEC, PENN POWER Case Related Document 7/27/2011 8/2/2011 M-2009-2092655
SM IMPLEMENTATION ORDER ON DATA INTERCHANGE 06202011.DOCX Tentative Order 7/8/2011 7/8/2011 M-2009-2092655
PET FOR EXTENSION OF TIME & PRELIMINARY PROPOSAL - EDEWG Petition for Extension of Time 12/7/2009 12/8/2009 M-2009-2092655
SMART METER MEETING ANNOUNCEMENT FOR JULY 16, 2009 Secretarial Letter 7/1/2009 M-2009-2092655
SMART METER IMPLEMENTATION ORDER INCORPORATING MOTION 6-23-09 Order 6/24/2009 6/24/2009 M-2009-2092655
STATEMENT OF RFP SMART METER IMPLEMENTATION ACT OF 129 2092655-LAW.DOC Statement 6/19/2009 M-2009-2092655
PUC ESTABLISHES SMART METER TECHNOLOGY PROCUREMENT STANDARDS FOR LARGE ELECTRIC UTILITIES Press Release 6/19/2009 M-2009-2092655
TC MOTION - 2092655-LAW - SMART METER.DOC Motion 6/18/2009 M-2009-2092655
COMMENTS-EXELON ENERGY Comments 4/20/2009 5/7/2009 M-2009-2092655
SL DENYING WALMART COMMENT PERIOD EXTENSION [2].DOC Denial Letter 5/6/2009 5/6/2009 M-2009-2092655
REPLY COMMENTS-PPL ELECTRIC UTILITIES Reply Comments 4/29/2009 5/6/2009 M-2009-2092655
REPLY COMMENTS - WAL-MART Reply Comments 5/1/2009 5/4/2009 M-2009-2092655
REPLY COMMENTS-PECO Reply Comments 4/29/2009 5/1/2009 M-2009-2092655
WAL-MART/SAM'S PETITION FOR EXTENSION OF TIME Petition for Extension of Time 4/29/2009 4/30/2009 M-2009-2092655
REPLY COMMENTS-INDUSTRIAL CUSTOMER GROUPS Reply Comments 4/29/2009 4/30/2009 M-2009-2092655
REPLY COMMENTS-METROPOLITAN EDISON,PENNSYLVANIA ELECTRIC AND PENNSYLVANIA POWER Reply Comments 4/29/2009 4/30/2009 M-2009-2092655
REPLY COMMENTS-ENERGY ASSOCIATION OF PENNSYLVANIA Reply Comments 4/29/2009 4/30/2009 M-2009-2092655
REPLY COMMENTS-DUQUESNE LIGHT COMPANY Reply Comments 4/29/2009 4/30/2009 M-2009-2092655
COMMENTS BY TRILLIANT Comments 4/17/2009 4/24/2009 M-2009-2092655
COMMENTS-CONSTELLATION NEWENERGY, INC. Comments 4/20/2009 4/23/2009 M-2009-2092655
COMMENTS-METROPOLITAN EDISON,PENNSYLVANIA ELECTRIC,PENNSYLVANIA POWER Comments 4/20/2009 4/23/2009 M-2009-2092655
COMMENTS REFILED-WEST PENN POWER.PDF Comments 4/23/2009 4/23/2009 M-2009-2092655
COMMENTS-DUQUESNE LIGHT COMPANY Comments 4/20/2009 4/22/2009 M-2009-2092655
COMMENTS-INDUSTRIAL CUSTOMER GROUPS Comments 4/20/2009 4/22/2009 M-2009-2092655
COMMENTS-PPL ELECTRIC UTILITIES CORPORATION Comments 4/20/2009 4/22/2009 M-2009-2092655
COMMENTS-ELSTER INTERGRATED SOLUTIONS Comments 4/20/2009 4/21/2009 M-2009-2092655
COMMENTS BY TENDRIL NETWORKS INC Comments 4/19/2009 4/21/2009 M-2009-2092655
COMMENTS-SENSUS METERING SYSTEMS Comments 4/20/2009 4/21/2009 M-2009-2092655
COMMENTS BY PECO ENERGY Comments 4/20/2009 4/21/2009 M-2009-2092655
COMMENTS BY CITIZEN POWER Comments 4/15/2009 4/21/2009 M-2009-2092655
COMMENTS - WEST PENN DBA ALLEGHENY POWER Comments 4/20/2009 4/20/2009 M-2009-2092655
COMMENTS - OCA Comments 4/20/2009 4/20/2009 M-2009-2092655
SMART METER SL EXTENDING COMMENT PERIOD.DOC Secretarial Letter 4/9/2009 4/9/2009 M-2009-2092655
SMART METER STAFF PROPOSAL AND QUESTIONS FOR COMMENT 3-27-09.DOC Secretarial Letter 3/30/2009 3/30/2009 M-2009-2092655

 

Need More Help?

If you can't find what you're looking for here, please contact the PA Public Utility Commission. Call us at 1-800-692-7380 or contact us online.

Document Search

Public utility documents available electronically include case dockets, public meeting orders and more.

Filing & Resources

Find utility-related reports, laws and regulations, federal filings, tariffs, procedures and more.

eFILING

Consumers, utilities and attorneys can save time by submitting documents to the PUC electronically.