Docket Number | M-2008-2069887 | Status | Closed |
---|---|---|---|
Applicant | ENERGY EFFICIENCY CONSERVATION PROGRAM & EDC PLAN | Utility Code | |
Complainant | Utility Name | ||
Respondent | Utility Type | ||
Responsible Bureau | ALJ | eFiling Confirmation Number | |
Date Filed | 10/20/2008 | Date Posted | 10/20/2008 |
Case Description | Energy Consumption and Peak Demand Reduction Targets |
Action Date | Description | Date Posted |
---|---|---|
11/30/2016 | Document Removed from Web - Document 'Cover Ltr to 2015 Final Annual EE&C Rpt-PECO Energy Co' has been removed from Web | 11/30/2016 |
11/30/2016 | Document Removed from Web - Document 'Cover Letter to EDC Annual Report - Program Year 7 - Peco' has been removed from Web | 11/30/2016 |
11/30/2016 | Document Removed from Web - Document '11.13.15 PECO PY6 Annual Report_Final_111315' has been removed from Web | 11/30/2016 |
11/30/2016 | Document Removed from Web - Document '11.15.16 PECO EE&CP PY7 Annual Report_20161411_Final.docx' has been removed from Web | 11/30/2016 |
11/18/2016 | Document Published on Web - Document 'Cover Letter to EDC Annual Report - Program Year 7 - Peco' is made public | 11/18/2016 |
11/18/2016 | Document Published on Web - Document '11.15.16 PECO EE&CP PY7 Annual Report_20161411_Final.docx' is made public | 11/18/2016 |
11/18/2016 | Document Attached to Case - Cover Letter to EDC Annual Report - Program Year 7 - Peco - Peco Energy Co filed EDC annual report for program year 7. | 11/18/2016 |
11/19/2015 | Document Published on Web - Document '11.13.15 PECO PY6 Annual Report_Final_111315' is made public | 11/19/2015 |
11/19/2015 | Document Published on Web - Document 'Cover Ltr to 2015 Final Annual EE&C Rpt-PECO Energy Co' is made public | 11/19/2015 |
11/19/2015 | Document Attached to Case - Cover Ltr to 2015 Final Annual EE&C Rpt-PECO Energy Co - PECO Energy Co filed Cover Ltr to 2015 Final Annual EE&C Report | 11/19/2015 |
11/24/2014 | Document Removed from Web - Document 'Energy Efficiency & Conservation Quarterly Rpt 6/1/14 thru 8/31/14 PY6 Q1-PECO ' has been removed from Web | 11/24/2014 |
10/29/2014 | Document Published on Web - Document 'Energy Efficiency & Conservation Quarterly Rpt 6/1/14 thru 8/31/14 PY6 Q1-PECO ' is made public | 10/29/2014 |
10/29/2014 | Document Attached to Case - Energy Efficiency & Conservation Quarterly Rpt 6/1/14 thru 8/31/14 PY6 Q1-PECO - PECO filed Energy Efficiency and Conservation Quarterly Report for June 1, 2014 through August 31, 2014. | 10/29/2014 |
3/20/2014 | Document Served & Send to C&A - Other - See Comments - petitions contesting filed witn 20 days of the order 4/9/14 | 3/20/2014 |
3/20/2014 | Document EServed to POR - Document 'Act 129 EEC Phase I EDC Compliance Order 2069887-LAW.doc' is eServed - {1D37DA0B-FBF0-4D9F-8AD5-D9E29816C71F} | 3/20/2014 |
3/20/2014 | Document Published on Web - Document 'Act 129 Statewide Evaluator Phase I Final Annual Report.pdf' is made public | 3/20/2014 |
3/20/2014 | Document Published on Web - Document 'Act 129 EEC Phase I EDC Compliance Order 2069887-LAW.doc' is made public | 3/20/2014 |
2/20/2014 | Document EServed to POR - Document 'Peak Demand Cost Effectiveness Final Order.doc' is eServed - {DFF16C7F-EB0C-4D1C-8EBC-C7467F2E577C} | 2/20/2014 |
2/20/2014 | Document Published on Web - Document 'Peak Demand Cost Effectiveness Final Order.doc' is made public | 2/20/2014 |
1/17/2014 | Document Published on Web - Document 'Reply Comments - PennFuture, Clean Air Council, et al' is made public | 1/17/2014 |
1/14/2014 | Document Published on Web - Document 'Reply Comments - OCA' is made public | 1/14/2014 |
1/13/2014 | Document Published on Web - Document 'Reply Comments - PPL' is made public | 1/13/2014 |
1/3/2014 | Document Published on Web - Document 'Comments - Met-Ed, Penelec, Penn Power & West Penn Power' is made public | 1/3/2014 |
1/3/2014 | Document Published on Web - Document 'Comments - Energy Association of Pennsylvania' is made public | 1/3/2014 |
1/3/2014 | Document Published on Web - Document 'Comments - Citizens of Pa's Future, et al' is made public | 1/3/2014 |
1/3/2014 | Document Published on Web - Document 'Comments - Peco Energy' is made public | 1/3/2014 |
12/30/2013 | Document Published on Web - Document 'Comments - IECPA et al' is made public | 12/30/2013 |
12/27/2013 | Document Published on Web - Document 'Comments - EPGA' is made public | 12/27/2013 |
11/14/2013 | Document EServed to POR - Document 'Peak Demand Cost Effectiveness Determination Tentative Order.doc' is eServed - {419A473A-7B2A-4FC8-9E7A-212FC2AA9024} | 11/14/2013 |
11/14/2013 | Document Published on Web - Document 'Peak Demand Cost Effectiveness Determination Tentative Order.doc' is made public | 11/14/2013 |
6/13/2013 | Document Removed from Web - Document 'QUARTERLY RPT FOR JUNE 2012-AUG 2012 - PROGRAM YEAR 4, QUARTER 1 - PPL ELECTRIC' has been removed from Web | 6/13/2013 |
6/12/2013 | Document Removed from Web - Document 'QUARTERLY RPT FOR 6/2012-8/2012 PROGRAM YEAR 4 QUARTER 1 - PPL ELECTRIC' has been removed from Web | 6/12/2013 |
6/11/2013 | Document Removed from Web - Document 'QUARTERLY RPT FOR JUNE 2012-AUG 2012 - PROGRAM YEAR 4, QUARTER 1 - PPL ELECTRIC' has been removed from Web | 6/11/2013 |
6/11/2013 | Document Removed from Web - Document 'QUARTERLY RPT FOR 6/2012-8/2012 PROGRAM YEAR 4 QUARTER 1 - PPL ELECTRIC' has been removed from Web | 6/11/2013 |
6/11/2013 | Document Removed from Web - Document 'QUARTERLY RPT FOR 6/2012-8/2012 FOR ITS EE&C PLAN - DUQUESNE LIGHT' has been removed from Web | 6/11/2013 |
6/10/2013 | Document Removed from Web - Document 'Quarterly EE&C Report for 6/1/12 to 8/31/12 - PECO' has been removed from Web | 6/10/2013 |
6/10/2013 | Document Removed from Web - Document 'Quarterly Report 12/1/12-2/28/13 - PY4,Quarter 3 - Peco' has been removed from Web | 6/10/2013 |
5/23/2013 | Document Published on Web - Document 'Supplement to Request for Expedited Approval of Minor EE&C Plan Changes - Penelec' is made public | 5/23/2013 |
5/23/2013 | Document Attached to Case - Supplement to Request for Expedited Approval of Minor EE&C Plan Changes - Penelec - Penelec filed a supplement to the request for Expedited Approval of Minor EE&C Plan Changes. | 5/23/2013 |
5/23/2013 | Document Attached to Case - Supplement to Request for Expedited Approval of Minor EE&C Changes - Met Ed - Met Ed filed the supplement to the request for Expedited Approval of the minor EE&C Changes. | 5/23/2013 |
5/23/2013 | Document Published on Web - Document 'Supplement to Request for Expedited Approval of Minor EE&C Changes - Met Ed' is made public | 5/23/2013 |
4/19/2013 | Document Attached to Case - Quarterly Report 12/1/12-2/28/13 - PY4,Quarter 3 - Peco - Peco Energy Co filed a quarterly report for the period December 1, 2012 through February 28, 2013. Program Year 4, Quarter 3. | 4/19/2013 |
4/19/2013 | Document Published on Web - Document 'Quarterly Report 12/1/12-2/28/13 - PY4,Quarter 3 - Peco' is made public | 4/19/2013 |
11/6/2012 | Document Published on Web - Document 'QUARTERLY RPT FOR 6/2012-8/2012 PROGRAM YEAR 4 QUARTER 1 - PPL ELECTRIC' is made public | 11/6/2012 |
11/6/2012 | Document Attached to Case - QUARTERLY RPT FOR 6/2012-8/2012 PROGRAM YEAR 4 QUARTER 1 - PPL ELECTRIC - PPL Electric Utilities Corp filed a quarterly report for the period of June 2012 through August 2012-Program Year 4, Quarter 1. | 11/6/2012 |
11/1/2012 | Document Published on Web - Document 'QUARTERLY RPT FOR JUNE 2012-AUG 2012 - PROGRAM YEAR 4, QUARTER 1 - PPL ELECTRIC' is made public | 11/1/2012 |
11/1/2012 | Document Attached to Case - QUARTERLY RPT FOR JUNE 2012-AUG 2012 - PROGRAM YEAR 4, QUARTER 1 - PPL ELECTRIC - PPL Electric Utilities Corp filed a quarterly report for Program Year 4, Quarter 1 for the period June 2012-August 2012 of the Act 129 Plan of 2008. | 11/1/2012 |
10/24/2012 | Document Attached to Case - QUARTERLY RPT FOR 6/2012-8/2012 FOR ITS EE&C PLAN - DUQUESNE LIGHT - Duquesne Light Company filed a quarterly report for June 2012 through August 2012 for its Energy Efficiency and Conservation and Demand Response Plan. | 10/24/2012 |
10/24/2012 | Document Published on Web - Document 'QUARTERLY RPT FOR 6/2012-8/2012 FOR ITS EE&C PLAN - DUQUESNE LIGHT' is made public | 10/24/2012 |
10/12/2012 | Document Attached to Case - Quarterly EE&C Report for 6/1/12 to 8/31/12 - PECO - PECO filed Quarterly Energy Efficiency & Conservation Report for 6/1/12 to 8/31/12. | 10/12/2012 |
10/12/2012 | Document Published on Web - Document 'Quarterly EE&C Report for 6/1/12 to 8/31/12 - PECO' is made public | 10/12/2012 |
9/27/2012 | Document Published on Web - Document 'EE&C Phase II Reconsideration Order on the Merits.doc' is made public | 9/27/2012 |
9/27/2012 | Document EServed to POR - Document 'EE&C Phase II Reconsideration Order on the Merits.doc' is eServed - {7A89B978-DAB5-41EF-B953-2610F3399F92} | 9/27/2012 |
9/19/2012 | Document Published on Web - Document 'Answer to Petition for Reconsideration - Clean Air Council & Sierra Club' is made public | 9/19/2012 |
9/19/2012 | Document Attached to Case - Answer to Petition for Reconsideration - Clean Air Council & Sierra Club - Clean Air Council and The Sierra Club filed answer in response to Petition for Reconsideration of PECO. | 9/19/2012 |
9/10/2012 | Document Removed from Web - Document 'PECO Phase II EE&C Proforma Reconsideration Order.doc' has been removed from Web | 9/10/2012 |
9/7/2012 | Document Published on Web - Document 'NOTICE OF APPEARANCE OF SPARKS & SACAVAGE - LAW' is made public | 9/7/2012 |
9/4/2012 | Document Published on Web - Document 'PECO Phase II EE&C Proforma Reconsideration Order.doc' is made public | 9/4/2012 |
9/4/2012 | Document EServed to POR - Document 'PECO Phase II EE&C Proforma Reconsideration Order.doc' is eServed - {48DD7CF5-14B4-4179-ADF3-7178EFC9100A} | 9/4/2012 |
9/4/2012 | Document Published on Web - Document 'Motion for Leave to file Petition for Reconsideration-PECO' is made public | 9/4/2012 |
8/31/2012 | Document Published on Web - Document 'RESPONSE TO FIRSTENERGY PETITION FOR RECONSIDERATION - CAUSE PA' is made public | 8/31/2012 |
8/31/2012 | Document Published on Web - Document 'Petition to Intervene - PennFUture' is made public | 8/31/2012 |
8/31/2012 | Document Published on Web - Document 'ANSWER TO FIRSTENERGY PETITION FOR RECONSIDERATION - OCA' is made public | 8/31/2012 |
8/31/2012 | Document Published on Web - Document 'ANSWER TO PPL PETITION FOR RECONSIDERATION - OCA' is made public | 8/31/2012 |
8/31/2012 | Document Published on Web - Document 'RESPONSE TO PPL PETITION FOR RECONSIDERATION - CAUSE PA' is made public | 8/31/2012 |
8/22/2012 | Document Published on Web - Document 'Petition for Reconsideration of OI 8/3/12 - PPL' is made public | 8/22/2012 |
8/22/2012 | Document Published on Web - Document 'Petition for Reconsideration of IO 8/3/12 - FirstEnergy Companies' is made public | 8/22/2012 |
8/22/2012 | Document Published on Web - Document 'Petition for Evidentiary Hearing - PPL' is made public | 8/22/2012 |
8/22/2012 | Document Published on Web - Document 'Petition for Evidentiary Hearing - Peco' is made public | 8/22/2012 |
8/2/2012 | Document Published on Web - Document '8.2.12 Gardner, Cawley Dissenting Statement' is made public | 8/2/2012 |
8/2/2012 | Document Published on Web - Document '8.2.12 Cawley Dissenting Statement' is made public | 8/2/2012 |
7/11/2012 | Document Published on Web - Document 'Reply Comments - EnerNOC Inc' is made public | 7/11/2012 |
7/11/2012 | Document Published on Web - Document 'Reply Comments - Energy Association of Pennsylvania' is made public | 7/11/2012 |
7/9/2012 | Document Published on Web - Document 'Reply Comments - PPL Electric' is made public | 7/9/2012 |
7/9/2012 | Document Published on Web - Document 'Reply Comments - AK Steel, et al ' is made public | 7/9/2012 |
7/9/2012 | Document Published on Web - Document 'Reply Comments - EMC Development' is made public | 7/9/2012 |
7/5/2012 | Document Published on Web - Document 'Petition for Extension of Time - Energy Assoc of Pa' is made public | 7/5/2012 |
6/28/2012 | Document Published on Web - Document 'Comments - Reinvestment Fund' is made public | 6/28/2012 |
6/27/2012 | Document Published on Web - Document 'COMMENTS - PECO' is made public | 6/27/2012 |
6/26/2012 | Document Published on Web - Document 'Comments - PPL' is made public | 6/26/2012 |
6/26/2012 | Document Published on Web - Document 'Comments - The Reinvestment Fund' is made public | 6/26/2012 |
6/26/2012 | Document Published on Web - Document 'Comments - Energy Association of Pennsylvania' is made public | 6/26/2012 |
6/26/2012 | Document Published on Web - Document 'Comments - Joint DR Commenters' is made public | 6/26/2012 |
6/25/2012 | Document Published on Web - Document 'COMMENTS - TRI STATE LIGHT & ENERGY INC' is made public | 6/25/2012 |
5/10/2012 | Document Published on Web - Document 'Gardner Dissenting Statement - Act 129 Phase 2.pdf' is made public | 5/10/2012 |
5/10/2012 | Document Published on Web - Document 'Gardner Statement - Act 129 Phase 2.pdf' is made public | 5/10/2012 |
2/2/2012 | Document Published on Web - Document 'QUARTERLY REPORT FOR 9/1/11-11/30/11 - PPL ELECTRIC UTILITIES CORP' is made public | 2/2/2012 |
1/27/2012 | Document Attached to Case - Act 129 EE&C Plan Qtrly Report 9/11-11/11 Program Yr 3 - PECO - PECO Energy Company filed Act 129 Energy Efficiency and Conservation Plan Quarterly Report for period September through November 2011 Program Three. | 1/27/2012 |
1/27/2012 | Document Published on Web - Document 'Act 129 EE&C Plan Qtrly Report 9/11-11/11 Program Yr 3 - PECO' is made public | 1/27/2012 |
11/21/2011 | Document Attached to Case - CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - MET ED - Met Ed, Penelec, Penn Power and West Penn Power filed their final annual report to the EE&C Program. | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'FINAL ANNUAL REPORT TO EE&C PLAN - WEST PENN POWER' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'FINAL ANNUAL REPORT TO EE&C PLAN - PENELEC' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - PENELEC' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'FINAL ANNUAL REPORT TO EE&C PLAN - MET ED' is made public | 11/21/2011 |
11/21/2011 | Document Attached to Case - CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - PENN POWER - Met Ed, Penelec, Penn Power and West Penn Power filed their final annual report to the EE&C Program. | 11/21/2011 |
11/21/2011 | Document Attached to Case - CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - PENELEC - Met Ed, Penelec, Penn Power and West Penn Power filed their final annual report to the EE&C Program. | 11/21/2011 |
11/21/2011 | Document Attached to Case - CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - WEST PENN POWER CO - Met Ed, Penelec, Penn Power and West Penn Power filed their final annual report to the EE&C Program. | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'FINAL ANNUAL REPORT TO EE&C PLAN - PENN POWER' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - WEST PENN POWER CO' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - MET ED' is made public | 11/21/2011 |
11/21/2011 | Document Published on Web - Document 'CVR LTR TO FINAL ANNUAL REPORT TO EE&C PLAN - PENN POWER' is made public | 11/21/2011 |
11/17/2011 | Document Published on Web - Document 'FINAL ANNUAL EE&C REPORT' is made public | 11/17/2011 |
11/17/2011 | Document Attached to Case - FINAL ANNUAL EE&C REPORT - Peco Energy Co filed their final annual energy efficiency & conservation report. | 11/17/2011 |
11/17/2011 | Document Published on Web - Document 'ANNUAL REPORT FOR EE&C RESPONSE PLAN - DUQUESNE LIGHT' is made public | 11/17/2011 |
11/17/2011 | Document Attached to Case - ANNUAL REPORT FOR EE&C RESPONSE PLAN - DUQUESNE LIGHT - Duquesne Light Co filed their final annual report for its Energy Efficiency and Conservation and Demand Response Plan. | 11/17/2011 |
11/17/2011 | Document Published on Web - Document 'FINAL ANNUAL REPORT FOR YEAR 2 OF ACT 129 PLAN - PPL ELECTRIC' is made public | 11/17/2011 |
10/26/2011 | Document Attached to Case - Energy Efficiency & Conservation Program Annual Report - PPL Electric - PPL Electric Utilities Copration filed Annual Report for Program Year 1 Ennergy Efficiency and Conservation Program. | 10/26/2011 |
10/26/2011 | Document Published on Web - Document 'Energy Efficiency & Conservation Program Annual Report - PPL Electric' is made public | 10/26/2011 |
10/24/2011 | Document Published on Web - Document 'EE&C & DEMAND RESPONSE PLAN 6/11 - 8/11 - DUQUESNE LIGHT' is made public | 10/24/2011 |
10/24/2011 | Document Attached to Case - ENERGY EFFICIENCY & CONSERVATION REPORT 6/11 - 8/11 - PECO - Peco Energy Co filed their 2011 quarterly energy efficiency and conservation report for the period June 1, 2011 - August 1, 2011. | 10/24/2011 |
10/24/2011 | Document Published on Web - Document 'ENERGY EFFICIENCY & CONSERVATION REPORT 6/11 - 8/11 - PECO' is made public | 10/24/2011 |
10/24/2011 | Document Attached to Case - EE&C & DEMAND RESPONSE PLAN 6/11 - 8/11 - DUQUESNE LIGHT - Duquesne Light Co filed their quarterly report for the period June 1, 2011 - August 31, 2011 for its Energy Efficiency and Conservation and Demand Response Plan. | 10/24/2011 |
7/27/2011 | Document Published on Web - Document 'PRELIMINARY ANNUAL REPORT FOR ENERGY EFFICIENCY AND CONSERVATION - DUQUESNE LIGHT CO' is made public | 7/27/2011 |
7/27/2011 | Document Attached to Case - PRELIMINARY ANNUAL REPORT FOR ENERGY EFFICIENCY AND CONSERVATION - DUQUESNE LIGHT CO - Duquesne Light company filed a preliminary annual report for it Energy Efficiency and Conservation and Demand Response Plan. | 7/27/2011 |
6/10/2011 | Document Published on Web - Document 'Order-2069887-Law-6-9-2011 Minor EE&C Plan Change Approval Process' is made public | 6/10/2011 |
6/10/2011 | Document EServed to POR - Document 'Order-2069887-Law-6-9-2011 Minor EE&C Plan Change Approval Process' is eServed - {A4C2772D-A46E-4E64-BEB6-B325BBB3AB26} | 6/10/2011 |
6/10/2011 | Document Served - Other - See Comments - FINAL ORDER ENTERED 6/10/11 | 6/10/2011 |
5/25/2011 | Document Served - Other - See Comments - sec letter served 5/25/11 | 5/25/2011 |
5/25/2011 | Document EServed to POR - Document 'Act 129 Annual & Quarterly Reporting Secretarial Letter.docx' is eServed - {C79AFDF1-34C8-4968-AD43-F094A2D0C5EB} | 5/25/2011 |
5/25/2011 | Document Published on Web - Document 'Act 129 Annual & Quarterly Reporting Secretarial Letter.docx' is made public | 5/25/2011 |
5/11/2011 | Document Published on Web - Document 'Reply Comments - PECO' is made public | 5/11/2011 |
5/11/2011 | Document Attached to Case - Reply Comments - PECO - PECO filed reply comments | 5/11/2011 |
5/5/2011 | Document Published on Web - Document 'Reply Comments - OSBA' is made public | 5/5/2011 |
5/5/2011 | Document Attached to Case - Reply Comments - OSBA - Office of Small Business Advocate filed Reply Comments. | 5/5/2011 |
5/4/2011 | Document Attached to Case - REPLY COMMENTS - IECPA, DI, MEIUG, PICA, MEIUG, PPUG, PAIEUG, PPLICA & WPPII - Industrial Energy Consumers of PA, Duquesne Industrial Intervenors, Met Ed Industrial Users Grop, Penelec Industrial Customer Alliance, Penn Power Users Group, Philadelphia Area Industrial Energy Users Group, PP&L Industrial Customer Alliance and West Penn Power Industrial Intervenors filed reply comments. | 5/4/2011 |
5/4/2011 | Document Published on Web - Document 'REPLY COMMENTS - ENERGY ASSOC OF PA' is made public | 5/4/2011 |
5/4/2011 | Document Attached to Case - REPLY COMMENTS - ENERGY ASSOC OF PA - Energy Association of PA filed reply comments. | 5/4/2011 |
5/4/2011 | Document Published on Web - Document 'REPLY COMMENTS - IECPA, DI, MEIUG, PICA, MEIUG, PPUG, PAIEUG, PPLICA & WPPII' is made public | 5/4/2011 |
5/3/2011 | Document Attached to Case - Reply Comments - PPL - PPL Electric filed Reply Comments. | 5/3/2011 |
5/3/2011 | Document Published on Web - Document 'Reply Comments - PPL' is made public | 5/3/2011 |
5/3/2011 | Document Attached to Case - Reply Comments - Met-Ed,Penelec,Penn Power,West Penn Power - Metropolitan Edison, Pennsylvania Power Company, Pennsylvania Electric Company, and West Penn Power Company filed Reply Comments. | 5/3/2011 |
5/3/2011 | Document Published on Web - Document 'Reply Comments - Met-Ed,Penelec,Penn Power,West Penn Power' is made public | 5/3/2011 |
4/26/2011 | Document Published on Web - Document 'COMMENTS - PECO ENERGY CO' is made public | 4/26/2011 |
4/26/2011 | Document Published on Web - Document 'COMMENTS - ENERGY ASSOC OF PA' is made public | 4/26/2011 |
4/26/2011 | Document Published on Web - Document 'COMMENTS - PPL ELECTRIC UTILITIES CORPORATION' is made public | 4/26/2011 |
4/26/2011 | Document Attached to Case - COMMENTS - MET ED, PENN POWER, PENELEC, WEST PENN POWER - Met Ed, Penelec, Penn Power and West Penn Power Co filed comments. | 4/26/2011 |
4/26/2011 | Document Published on Web - Document 'COMMENTS - MET ED, PENN POWER, PENELEC, WEST PENN POWER' is made public | 4/26/2011 |
4/26/2011 | Document Attached to Case - COMMENTS - PECO ENERGY CO - Peco Energy Company filed comments. | 4/26/2011 |
4/26/2011 | Document Attached to Case - COMMENTS - ENERGY ASSOC OF PA - Energy Association of PA filed comments. | 4/26/2011 |
4/26/2011 | Document Attached to Case - COMMENTS - PPL ELECTRIC UTILITIES CORPORATION - PPL Electric Utilities Corporation filed comments. | 4/26/2011 |
4/21/2011 | Document Attached to Case - Comments - PPL Electric Util Corp - Comments filed by PPL Electric Utilities Inc. | 4/21/2011 |
4/21/2011 | Document Published on Web - Document 'Comments Duquesne Light 4/21/11 ' is made public | 4/21/2011 |
4/21/2011 | Document Published on Web - Document 'Comments - PPL Electric Util Corp' is made public | 4/21/2011 |
4/21/2011 | Document Attached to Case - Comments Duquesne Light 4/21/11 - Comments filed by Duquesne Light Company. | 4/21/2011 |
4/12/2011 | Document Served & Pend - Pend for Comments | 4/12/2011 |
4/1/2011 | Document Served & Send to C&A - Other - See Comments - Comments within 20 days and replies within 30 days of Tentative Order served on 4/1/11 | 4/1/2011 |
4/1/2011 | Document EServed to POR - Document 'Order (Tentative) - 2069887-Law - 3-31-2011- Minor EE&C Plan Change Approval process' is eServed - {4A40043C-1A8C-482A-A5E1-C108669831CB} | 4/1/2011 |
4/1/2011 | Document Published on Web - Document 'Order (Tentative) - 2069887-Law - 3-31-2011- Minor EE&C Plan Change Approval process' is made public | 4/1/2011 |
3/4/2011 | Document Published on Web - Document 'Sec Letter-DR Data Reporting-M-2008-2069887.docx' is made public | 3/4/2011 |
3/4/2011 | Document EServed to POR - Document 'Sec Letter-DR Data Reporting-M-2008-2069887.docx' is eServed - {9C1AEF64-3438-45B0-86B3-1A4D51803F47} | 3/4/2011 |
3/4/2011 | Document Served - Other - See Comments - SEC LTR SERVED 3/4/11 | 3/4/2011 |
1/12/2011 | Document Published on Web - Document 'SEC LTR-DR Data Reporting-M-2008-2069887.docx' is made public | 1/12/2011 |
1/12/2011 | Document Served - Other - See Comments - sec ltr served 1/12/11 | 1/12/2011 |
1/12/2011 | Document EServed to POR - Document 'SEC LTR-DR Data Reporting-M-2008-2069887.docx' is eServed - {747AECB8-F6AB-4053-9B52-1F23F43C7183} | 1/12/2011 |
11/14/2010 | Document Published on Web - Document 'Application Updates/Revisions-PPL Modified CSP Contract' is made public | 11/15/2010 |
11/9/2010 | Document Removed from Web - Document 'COMMENTS-ANSI/ASHRAE/IESNA' has been removed from Web | 11/9/2010 |
11/9/2010 | Document Published on Web - Document 'COMMENTS-ANSI/ASHRAE/IESNA' is made public | 11/9/2010 |
6/24/2010 | Document Served - Other - See Comments - SL served 6/24/10 | 6/24/2010 |
6/24/2010 | Document Published on Web - Document 'EEC Annual Report 3 - Secretarial Letter' is made public | 6/24/2010 |
6/8/2009 | Document Published on Web - Document 'COMMENTS-OCA' is made public | 6/8/2009 |
6/5/2009 | Document Published on Web - Document 'COMMENTS-WEST PENN POWER CO' is made public | 6/5/2009 |
6/5/2009 | Document Attached to Case - COMMENTS-WEST PENN POWER CO - West Penn Power Company filed comments | 6/5/2009 |
6/2/2009 | Document Published on Web - Document 'EEC Reconsideration Order (5/28/2009)' is made public | 6/2/2009 |
6/2/2009 | Document Served - Other - See Comments - Order entered 6/2/09. | 6/2/2009 |
5/11/2009 | Document Published on Web - Document 'EE&C Plan Template - Sec Letter_FINAL.doc' is made public | 5/11/2009 |
5/7/2009 | Document Served - Other - See Comments - SL served 5/7/09. | 5/7/2009 |
5/7/2009 | Document Published on Web - Document 'EE&C Plan Template - Sec Letter_FINAL.doc' is made public | 5/7/2009 |
4/22/2009 | Document Published on Web - Document 'Application Updates/Revisions-PPL Modified CSP Contract' is made public | 4/22/2009 |
4/22/2009 | Document Attached to Case - Application Updates/Revisions-PPL Modified CSP Contract - PPL Electric Utilities filed Modified Standard Form Conservation Service Provider Contract. | 4/22/2009 |
4/10/2009 | Document Published on Web - Document 'Reply Comments - CONSERVATION SERVICES GROUP' is made public | 4/10/2009 |
4/7/2009 | Document Published on Web - Document 'Comments - PA HOME ENERGY' is made public | 4/7/2009 |
4/2/2009 | Document Published on Web - Document 'DUQUESNE LIGHT-Reply Comments' is made public | 4/2/2009 |
4/2/2009 | Document Published on Web - Document 'ENERNOC-Reply Comments' is made public | 4/2/2009 |
4/2/2009 | Document Published on Web - Document 'Reply Comments-PECO Energy Company' is made public | 4/2/2009 |
4/2/2009 | Document Published on Web - Document 'M-2008-2069887 LOAD FORECAST ORDER.doc' is made public | 4/2/2009 |
4/2/2009 | Document Published on Web - Document 'Reply Comments-PPL Electric Utilities Corporation' is made public | 4/2/2009 |
4/2/2009 | Document Published on Web - Document 'ENERNOC-Reply Comments' is made public | 4/2/2009 |
4/2/2009 | Document Attached to Case - ENERNOC-Reply Comments - REPLY COMMENTS FILED BY ENERNOC. | 4/2/2009 |
4/1/2009 | Document Published on Web - Document 'COMMENTS BY DEP' is made public | 4/1/2009 |
4/1/2009 | Document Published on Web - Document 'COMMENTS BY ALLEGHENY POWER' is made public | 4/1/2009 |
4/1/2009 | Document Attached to Case - COMMENTS BY DEP - COMMENTS FILED BY DEPT OF ENVIRONMENTAL PROTECTION. | 4/1/2009 |
4/1/2009 | Document Attached to Case - COMMENTS BY ALLEGHENY POWER - WEST PENN POWER D/B/A ALLEGHENY POWER FILED COMMENTS. | 4/1/2009 |
4/1/2009 | Document Published on Web - Document 'Comments by Industrial Energy Consumers of PA, Et Al ' is made public | 4/1/2009 |
4/1/2009 | Document Attached to Case - Comments by Industrial Energy Consumers of PA, Et Al - INDUSTRIAL ENERGY CONSUMERS OF PA, ET AL FILED COMMENTS. | 4/1/2009 |
3/31/2009 | Document Published on Web - Document 'Reply Comments-ENERGY ASSOC OF PA' is made public | 3/31/2009 |
3/30/2009 | Document Published on Web - Document 'M-2008-2069887 LOAD FORECAST ORDER.doc' is made public | 3/30/2009 |
3/30/2009 | Document Served - Other - See Comments - Order entered 3/30/09. | 3/30/2009 |
3/25/2009 | Document Published on Web - Document 'Allegheny Power Reply to Data Request' is made public | 3/25/2009 |
3/25/2009 | Document Attached to Case - Allegheny Power Reply to Data Request - ALLEGHEN POWER FILED ANSWER TO DATA REQUEST #1-4 | 3/25/2009 |
3/17/2009 | Document Published on Web - Document 'Comments-ENERGY ASSOC OF PA' is made public | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS-UGI GAS' is made public | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS-DUQUESNE LIGHT' is made public | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS-PPL ELECTRIC UTILITIES CORP' is made public | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS-PECO' is made public | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS-WEST PENN POWER' is made public | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS-PECO - COMMENTS FILED BY PECO ENERGY COMPANY | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS-UGI GAS - COMMENTS FILED BY UGI UTILITIES, INC-GAS DIVISION | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS-PPL ELECTRIC UTILITIES CORP - COMMENTS FILED BY PPL ELECTRIC UTILITIES CORPORATION | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS-WEST PENN POWER - COMMENTS FILED BY WEST PENN POWER COMPANY | 3/17/2009 |
3/17/2009 | Document Published on Web - Document 'COMMENTS - ELSTER INTEGRATED SOLUTIONS' is made public | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS-DUQUESNE LIGHT - DUQUESNE LIGHT COMPANY FILED COMMENTS | 3/17/2009 |
3/17/2009 | Document Attached to Case - COMMENTS - ELSTER INTEGRATED SOLUTIONS - COMMENTS ON BEHALF OF ELSTER INTEGRATED SOLUTIONS IN RESPONSE TO THE PROPOSED UPDATE TO THE TECHNICAL REFERENCE MANUAL. | 3/17/2009 |
3/17/2009 | Document Attached to Case - Comments-ENERGY ASSOC OF PA - COMMENTS FILED BY ENERGY ASSOCIATION OF PENNSYLVANIA. | 3/17/2009 |
3/3/2009 | Document Published on Web - Document 'COMMENTS-ANSI/ASHRAE/IESNA' is made public | 3/3/2009 |
3/3/2009 | Document Attached to Case - COMMENTS-ANSI/ASHRAE/IESNA - COMMENTS FILED ON BEHALF OF ANSIASHRAE/IESNA | 3/3/2009 |
2/20/2009 | Document Published on Web - Document 'Secretarial letter re updated TRM' is made public | 2/20/2009 |
2/20/2009 | Document Served - Other - See Comments - SL served 2/20/09. | 2/20/2009 |
2/19/2009 | Document Published on Web - Document 'Petition for Extension of Time and Answer-DEP' is made public | 2/19/2009 |
2/19/2009 | Document Attached to Case - Petition for Extension of Time and Answer-DEP - DEP filed request for extension of time and answer to petition. | 2/19/2009 |
2/17/2009 | Document Published on Web - Document 'EE&C Program Implementation Order' is made public | 2/17/2009 |
2/11/2009 | Document Published on Web - Document 'Consumption Forecast-PECO' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Exhibit 1.xls-West Penn Power' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Exhibit 2.1.txt-West Penn Power' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Consumption Forecast-Exhibits 2 & 3-West Penn' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Consumption Forecast-Met Ed, Penelec, Penn Power' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Consumption Forecast-PPL' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Exhibit 4 - 2-6-09.xls-West Penn Power' is made public | 2/11/2009 |
2/11/2009 | Document Published on Web - Document 'Consumption Forecast-Duquesne Light' is made public | 2/11/2009 |
2/11/2009 | Document Attached to Case - Consumption Forecast-PPL - PPL filed Consumption Forecast. | 2/11/2009 |
2/11/2009 | Document Attached to Case - Consumption Forecast-PECO - PECO filed Consumption Forecast. | 2/11/2009 |
2/11/2009 | Document Attached to Case - Consumption Forecast-Met Ed, Penelec, Penn Power - Met Ed, Penelec and Penn Power filed Consumption Forecast. | 2/11/2009 |
2/11/2009 | Document Attached to Case - Consumption Forecast-Exhibits 2 & 3-West Penn - West Penn Power filed Consumption Forecast. | 2/11/2009 |
2/11/2009 | Document Attached to Case - Consumption Forecast-Duquesne Light - Duquesne Light filed Consumption Forecast. | 2/11/2009 |
2/5/2009 | Document Published on Web - Document 'FIRST ENERGY DOC REQ FOR PROPOSAL' is made public | 2/5/2009 |
2/5/2009 | Document Attached to Case - FIRST ENERGY DOC REQ FOR PROPOSAL - MET-ED, PENELEC AND PENN POWER FILED PROPOSED REQUEST FOR PROPOSAL PROCESS DOCUMENTS IN ACCORDANCE WITH IMPLEMENTATION ORDER ENTERED 01/16/09 | 2/5/2009 |
2/3/2009 | Document Attached to Case - Petition for Reconsideration and Clarification-Energy Association of PA - Energy Association of Pennsylvania filed Petition for Clarification and Reconsideration. | 2/4/2009 |
2/3/2009 | Document Published on Web - Document 'PETITION FOR CLARIFICATION OF IMPLEMENTATION ORDER' is made public | 2/4/2009 |
2/3/2009 | Document Attached to Case - PETITION FOR CLARIFICATION OF IMPLEMENTATION ORDER - PETITION FOR CLARIFICATION OF IMPLEMENTATION ORDER OF INDUSTRIAL ENERGY CONSUMERS OF PENNSYLVANIA, ETC. | 2/4/2009 |
2/3/2009 | Document Published on Web - Document 'Petition for Reconsideration and Clarification-Energy Association of PA' is made public | 2/4/2009 |
1/22/2009 | Document Published on Web - Document 'Comments-National Resources Defense Council' is made public | 1/22/2009 |
1/22/2009 | Document Attached to Case - Comments-National Resources Defense Council - Natural Resources Defense Council filed Comments. | 1/22/2009 |
12/30/2008 | Document Attached to Case - Reply Comments - REALWINWIN INC - REALWINWIN INC FILED REPLY COMMENTS | 12/30/2008 |
12/24/2008 | Document Attached to Case - Reply Comments-SUSTAINABLE ENERGY FUND - REPLY COMMENTS FILED BY SUSTAINABLE ENERGY FUND. | 12/24/2008 |
12/23/2008 | Document Attached to Case - ALTIMATE ENERGY-REPLY COMMENTS - REPLY COMMENTS OF ALTIMATE ENERGY | 12/23/2008 |
12/23/2008 | Document Attached to Case - PENNFUTURE-REPLY COMMENTS - REPLY COMMENTS ON BEHALF OF PENNFUTURE | 12/23/2008 |
12/23/2008 | Document Attached to Case - DEP-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION | 12/23/2008 |
12/23/2008 | Document Attached to Case - ALLEGHENY POWER-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF WEST PENN POWER COMPANY D/B/A ALLEGHENY POWER | 12/23/2008 |
12/23/2008 | Document Attached to Case - WAL-MART-REPLY COMMENTS - REPLY COMMENTS ON BEHALF OF WAL-MART. | 12/23/2008 |
12/23/2008 | Document Attached to Case - IECPA-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF IECPA, PAIEUG, MEIUG, PICA, PPLICA, DDI, PPUG AND WPPII | 12/23/2008 |
12/23/2008 | Document Attached to Case - PPL ELECTRIC-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF PPL ELECTRIC UTILITIES CORPORATION | 12/23/2008 |
12/23/2008 | Document Attached to Case - UGI CORP-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF UGI CORPORATION (UGI UTILITIES, UGI PENN NATURAL GAS COMPANY AND UGI CENTRAL PENN GAS) | 12/23/2008 |
12/23/2008 | Document Attached to Case - FIRST ENERGY-REPLY COMMENTS - REPLY COMMENTS ON BEHALF OF PENELEC, PENN POWER AND MET ED. | 12/23/2008 |
12/23/2008 | Document Attached to Case - DUQUESNE LIGHT-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF DUQUESNE LIGHT COMPANY | 12/23/2008 |
12/23/2008 | Document Attached to Case - TRILLIANT INC-REPLY COMMENTS - REPLY COMMENTS ON BEHALF OF TRILLIANT INC | 12/23/2008 |
12/23/2008 | Document Attached to Case - OSBA-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF OSBA | 12/23/2008 |
12/23/2008 | Document Attached to Case - ENERGY ASSOC. OF PA-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF ENERGY ASSOCIATION OF PENNSYLVANIA | 12/23/2008 |
12/23/2008 | Document Attached to Case - KEYSTONE ENERGY-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF KEYSTONE ENERGY EFFICIENCY ALLIANCE. | 12/23/2008 |
12/23/2008 | Document Attached to Case - PECO ENERGY-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF PECO ENERGY COMPANY | 12/23/2008 |
12/23/2008 | Document Attached to Case - E CUBED CO-REPLY COMMENTS - REPLY COMMENTS FILED ON BEHALF OF THE E CUBED COMPANY LLC | 12/23/2008 |
12/22/2008 | Document Attached to Case - CLEAR CHOICE ENERGY REPLY COMMENTS - REPLY COMMENTS FILED BY CLEAR CHOICE ENERGY. | 12/22/2008 |
12/19/2008 | Document Attached to Case - J VULLO Notice Appear - JOSEPH L VULLO FILED NOTICE OF APPEARANCE ON BEHALF ON COMMUNITY OF ECONOMIC OPPORTUNITY | 12/19/2008 |
12/19/2008 | Document Attached to Case - Transcript-11-19-08 - Transcript for hearing held 11/19/08 in Harrisburg pages 1-236 filed. | 12/19/2008 |
12/19/2008 | Document Attached to Case - Reply Comments-Federal Trade Commission - Federal Trade Commission filed Reply Comments. | 12/19/2008 |
12/19/2008 | Document Attached to Case - Comments-E Cubed Company - Comments filed by E Cubed Company. | 12/19/2008 |
12/19/2008 | Document Attached to Case - Comments-DGS - Comments filed by DGS. | 12/19/2008 |
12/10/2008 | Document Attached to Case - Comments-UGI Utilities et al - UGI Utilities filed Comments. | 12/10/2008 |
12/9/2008 | Document Attached to Case - Communication-Comments.PDF-OCA - OCA filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Industrial Energy Consumers of PA et al - Industrial Energy Users Group of PA et al filed comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Performance Systems Development - Performance Systems Development filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Keystone Energy Efficiency Alliance - Keystone Energy Efficiency Alliance. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Department of Environmental Protection - Department of Environmental Protection filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-PECO - PECO filed comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-OSBA - OSBA filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-PennFutures - PennFuture filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - ClearChoice Energy Comments - COMMENTS FILED BY CLEARCHOICE ENERGY. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Communication-Comments.pdf - National Fuel Gas filed Comments | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Responses-West Penn Power | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-PPL - PPL filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Energy Association | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Met Ed, Pennsylvania Electric, Pennsylvania Power - Metropolitan Edison, Pennsylvania Electric and Pennsylvania Power filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Reinvestment Fund - The Reinvestment Fund filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Reliant Energy - Reliant Energy filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-United States Steel - United States Steel filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-National Association of Energy Service Companies - National Association of Energy Service Companies filed Comments. | 12/9/2008 |
12/9/2008 | Document Attached to Case - Comments-Duquesne Light - Duquesne Light filed Comments. | 12/9/2008 |
12/2/2008 | Document Served - Other - See Comments - Sec Letter served 11/26/2008. | 12/2/2008 |
12/2/2008 | Document Attached to Case - Communication-Reply Comments - REPLY COMMENTS FILED BY ELSTER INTERGRATED SOLUTIONS | 12/2/2008 |
12/2/2008 | Document Served - Other - See Comments - Sec. Letter served 11/26/2008. | 12/2/2008 |
12/2/2008 | Document Attached to Case - Communication-Reply Comments - REPLY COMMENTS FILED BY KEYSTONE ENERGY EFFICIENCY ALLIANCE. | 12/2/2008 |
11/20/2008 | Document Attached to Case - Communication-Comments - Clear Choice Energy filed Comments. | 11/20/2008 |
11/7/2008 | Document Attached to Case - Communication-Comments - DUQUESNE LIGHT COMPANY FILED COMMENTS | 11/7/2008 |
11/7/2008 | Document Attached to Case - Communication-Comments - ENERGY ASSOCIATION OF PENNSYLVANIA FILED COMMENTS. | 11/7/2008 |
11/7/2008 | Document Attached to Case - Communication-Comments - UGI UTILITIES, INC-ELECTRIC DIVISION FILED COMMENTS. | 11/7/2008 |
11/7/2008 | Document Attached to Case - Communication-Comments - INDUSTRIAL ENERGY CONSUMERS OF PENNSYLVANIA(IECPA) et al FILED COMMENTS. | 11/7/2008 |
11/7/2008 | Document Attached to Case - Communication-Comments - PENNSYLVANIA GAS ASSOCIATION FILED COMMENTS. | 11/7/2008 |
11/6/2008 | Document Attached to Case - Communication-Comments - FIRST ENERGY FILED COMMENTS | 11/6/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - COMVERGE, INC. FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - OFFICE OF SMALL BUSINESS ADVOCATE(OSBA) FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - RETAIL ENERGY SUPPLY ASSOCIATION FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - PENNSYLVANIA UTILITY LAW PROJECT FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - CITIZENS FOR PENNSYLVANIA'S FUTURE(PENNFUTURE) FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - KEYSTONE ENERGY EFFICIENCY ALLIANCE(KEEA) FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - SENSUS METERING SYSTEMS FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - THE E CUBED COMPANY LLC FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - ELSTER INTEGRATED SOLUTIONS FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - eMETER STRATEGIC CONSULTING FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - AUGUSTA SYSTEMS INC FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - THE REINVESTMENT FUND FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - DEPARTMENT OF ENVIRONMENTAL PROTECTION(DEP) FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - WEST PENN POWER COMPANY D/B/A ALLEGHENY POWER FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - PPL ELECTRIC UTILITIES CORPORATION FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - RELIANT ENERGY INC FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - OFFICE OF CONSUMER ADVOCATE(OCA) FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - CLEARCHOICE ENERGY FILED COMMENTS. | 11/5/2008 |
11/5/2008 | Document Attached to Case - Communication-Comments - PECO ENERGY COMPANY FILED COMMENTS | 11/5/2008 |
11/4/2008 | Document Attached to Case - Communication-Comments - ENERGY CONNECT INC FILED COMMENTS. | 11/4/2008 |
10/20/2008 | Case Assigned to Bureau - LAW | 10/20/2008 |
10/20/2008 | Case Created - M-2008-2069887 - Energy Efficiency and Conservation Program and EDC Plans | 10/20/2008 |
Need More Help?
If you can't find what you're looking for here, please contact the PA Public Utility Commission. Call us at 1-800-692-7380 or contact us online.
Document Search
Public utility documents available electronically include case dockets, public meeting orders and more.
Filing & Resources
Find utility-related reports, laws and regulations, federal filings, tariffs, procedures and more.
eFILING
Consumers, utilities and attorneys can save time by submitting documents to the PUC electronically.